PPL 723.06KWp Grid-Tied Solar Power Plant
Projects Details
Capacity
78.20 KWp
Client
Green Textile Ltd
Location
Valuka, Mymensingh
Average expected Annual Production
104,162 kWh
No. of Panel Used
No of Inverters Used
3
Synchronized with
BREB, Diesel Generator
Related Projects

Snowtex Sportswear Limited 419.65KWp Industrial Solar Project
Location: Dhamrai, Dhaka419.65KWp Industrial Solar Project
More Details
KA Design Ltd. 428.22 KWp Rooftop Solar Project
Location: Boroberadia, Badda, DhakaAGC 24.96 kWp Grid-Tied Solar Power Plant
Location: Dhaka CantonmentSCUBE proudly have completed this project of Army Golf Club in Dhaka Cantonment.
More DetailsPTL 25 kWp Grid-Tied Solar Power Plant
Location: Sreepur, GazipurA solar rooftop project of Paramount Textile in Sreepur, Gazipur ..
More DetailsACT 20 kWp Grid-Tied Solar Power Plant
Location: Fatullah, Narayanganjits a project of Abanti Color Tex in Fatullah, Narayanganj..
More DetailsFTL 27.5 kWp Grid-Tied Solar Power Plant
Location: Sreepur, GazipurFTL 27.5 kWp Grid-Tied Solar Power Plant, A Project of Fakhruddin Textile..
More DetailsGTL 78.20 kWp Grid-Tied Solar Power Plant
Location: Valuka, MymensinghGTL 78.20 kWp Grid-Tied Solar Power Plant, A Project of Green Textile Ltd
More Details
UHM 255.06 kWp Grid-Tied Solar Power Plant
Location: AEPZ, NarayanganjUHM 255.06 kWp Grid-Tied Solar Power Plant Project By UHM Ltd.